The lead was moved by aggrassive external force, so it made a little gab that let the air leak into the lamp. When we passed
to the lamp, it became NG. After we measured the thickness of board, the customer board is thicker than ASI.
To prevent this accident, we would like to uprightly put the lamp into board, make sure that it is the right position then twist it more carefully.