A metallurgical engineer is considering two materials
for use in a space vehicle. All estimates are
made. ( a ) Which should be selected on the basis of
a present worth comparison at an interest rate of
12% per year? ( b ) At what first cost for the material
not selected above will it become the more economic alternative?