6) If the automatic closing operation of the affected circuit breaker is not successful during the first attempt, two more attempts will be made by the system to reclose the affected circuit breaker at an interval of not less than 15 seconds provided that no fault is detected by subsequent load measurements. Afterward, human intervention will be required by the ECO via his SCADA workstation at CCR.