The GC was equipped with a split injector at 200 C with a split ratio of 1:10. Helium gas of 99.995% purity was used as carrier gas at flow rate of 1.51 ml min1. The oven initial temperature was set to 70 C for 2 min and then increased to 300 C at a rate of 10 C min1 and maintained for 7 min