TTKL collects basic information on running times and transport
distances necessary for determining the routes and provides them to TMT.
TMT then calculates the transport volume everyday based on parts
information, the production plan and container sizes, and then determines
the routing and scheduling plan using an optimization system for operations
management. Based on these results, TTKL prepares the stowage plan,
truck diagram and the schedule of the host terminal.