PROCESS CONTROL
1. Is there any policy or procedure that controls the raw material quality, such as incoming material checking, testing or certificate of material required)?
2. Is there any reference / approved sample used for checking purpose?
3. Is there any specification of raw material or product?
4. Is there any adjustment or calibration of measuring and monitoring devices record and certificate (e.g. metal detector, tension gauge, etc)?
5. Is there any re-work procedure or system ensuring the safety, legality and quality of the finished product?
6. Factory did not use sub-contractors?
7. If “No”, are they well controlled?
8. Is there suitable warehouse for storage finished goods (clean, tidy and big enough)?
9. Is there any suitable pest prevention in place?