76 %. This was possible through the application of LMS tools. SMED was used for the reduction of setup time of expander. Another LMS tool, Kaizen, was used to make design and work methods change of the machine components and work elements involved in setup of the expander to reduce the setup time in multiple stages (continuous improvement) from 60 to