Dear k. Chittinat/k.Somporn/Tony,
For MEP for IT system shall be consolidated document and dwg for the following information ;
- Main Power supply back-up by Generator for IT UPS by CB 3 P 50 A at 3rd floor Hub Room and 4th Floor Hub Room shall be provided by MEP base building scope.(Please see attached Dwg) But not no panelboard and UPS that shall be by IT contractor scope.
- Main Telephone Line from AIA Sathorn telephone system by 40 Pairs cable to Telephone cabinet in Hub Room shall be provided by MEP base building scope . (Please see attached DWG)
- Clean Earth for IT and communication system shall be provided already by base building scope in Hub Room 3rd Floor/4th Floor (Please see attached DWG)
- Lay out for Data outlet in IT Scope shall be as E3-01,E3-02 for your information(,a bit changing at site). (Please see attached DWG)
- Lay out of AP Wifi that in IT scope shall be as E4-07,E4-08 for your information (Please see attached DWG) and comment/information by AIA HK.
- Cabling system link between Hub Room ( UTP and Fibre Optic cable ) have provided by MEP scope in Diagram attached.
- Specification for DATA Rack and horizontal data system for your information are in attached .
If you have any queries, please feel free to contact us ASAP.
Br,
Wanassara