Table 4.0 shows that the current setup time for loading
process is 123.47 minutes in the overall non-value added
time of 367.37 minutes. This higher value of setup time
has lead to the low value of OEE since the before cure
process that involved most of the setup activities that
analyze through the FMEA shows highest risk priority in
the overall operation. The proposed alternative tool and
techniques have been clarified through several researchers
that it seems to be an effective tool on reducing the setup
and changeover time of process through a rapid change
methodology of SMED. Table 4.2 shows the expected
result of autoclave curing process which consist of the
improvement of value added (VA) and non-value added
(NVA) time before and after the implementation of
SMED. It shows that SMED contribute the improvement
in eliminate the non-value added time.