Please be informed that today, the technician’s team of 21-Design to be changed the transition of Phase Protection at the MDB control box and we need to shut down the Electricity in time 12:00 to 13:00 pm.
Regarding the occurrence of frequent power outages office. The team has coordinated with the security team of 21-Design technicians to analyze the causes and find ways to prevent and address from an initial examination found no abnormalities MDB control box, the technical assumption seems to be a problem caused by the dislocation of the Phase Protection who made the previous electric power trip case of a power cut or exceeding guidelines. Perform basic solving team of technicians will replace the new Phase Protection and follow-up result period 1-month.