The mould start to be cured for a period of up to 6 hours
depends on the time spent for each panel of product. The
curing graph shown from the system is monitoring by the
operators for the whole curing process. When the curing is
end, the graph is being inspected. If there are any issues
occurred, they will pass to the Material Review Board
(MRB) to analyze the potential causes. The door ring is
unlocked and autoclave door is opened. Vacuum hose and
thermocouple is unplugging internally and tidy up. The
panel is stacking out from the autoclave by the cart caddy
and change to stacker to move it to the after cure area. The
cured mould is being inspect and sent to the downstream
area which is demould department for the next action.