Brune had adopted the following procedures: reservoir surveys with suspended measurement downstream for
measuring annual sediment accumulated in the reservoir and for sampling sediments passing over the dam through
outlet, and reservoir surveys with suspended load measurements up and down streams for evaluating the percentage of suspended sediment.