Dear K.Fa krub,
Here is my comment on process flow after briefly review
1. We add rubber mould process into flow as well. Thus, do it need to be swim lane for NPI who provide PM as part of chain as we have LP in flow krub?
2. For wax setting process, we use outsource as main, do we need to add outsource as well? Or everything consider as production flow
3. There are repair casting process but it didn’t include in here as we have in final QC. Do we need krub?
4. There are different symbol but I am not sure the real intention of each versus actual process krub. For example,
a. At prepare order, we have inspection process as well but in symbol, it didn’t include krub.
b. We have QA in process now, do we need to add krub?
c. In FN, we have counting and inspection process in some process as we see weight measurement and counting piece or sampling inspection at tumbling, Is it need to be included krub.
5. There is item P-4977 which have two piece. One silver and one gold with wax setting. However, now the process is combined to one with wax setting. Is it intention to show only one with longest process krub?
For item 4, I am not sure the intention of symbol versus actual process that we have krub. Anyway, I encourage you to work through actual process in shop floor now and you might be able to give team understanding on intention of each symbol krub.