A
four-cell,1000 L ABR,was located in PCWRA's unheated Headworks
building. The pilot was operated continuously for two years,
treating 1728 L per day of screened (8 mm) and degritted municipal
wastewater at ambient temperature. The cells were spatially
separated to allow for valving, sampling ports, and instrumentation;
a schematic is presented in