The details
- Downtime, changeover time, set up time
- Waste/defect of each machine
- cPk statistic control
- standard vibration of the machine
- thermoscan while machine operate, temperature differential between cold and hot spot
- change part list (for 2 years)
- FMEA of the machine
- After sale service
- For local service, do you have the qualify person
- Weak point of the machine
- Heat load and water consumption
- Have the low voltage interfere the machine (noise control)
- Dimension
- Training, FAT, qualification program
- Maintenance program (for 2 years)
- PID diagram