Place and secure a geotextile or vegetation matting, if required, inside the wrap-around face to prevent the loss of fill material through the face. Place the hooked bars to fix the geometry of the formwork to the slope angle as per design. If appropriate place a nominal thickness of at least 150mm of topsoil immediately behind the geotextile or matting to promote vegetation.