5.5 Pre-Work Checks
5.5.1 Before work commences, the supervisor in charge of the work shall ensure:
1) that all necessary permits have been obtained.
2) that all necessary electrical, mechanical and process inflations have been positively carried out.
3) that all static, moving, lifting and anchoring equipment, integral to the means of access and high structure, inclusive of those associated with the work task, are corers and high structure, inclusive of access and high structure, inclusive of those associated with the work tack, are correctly fitted, conditionally sound and fit for the intended purpose.
4) that all personnel have been provided with the required personal protection.
5) that all personnel have been briefed in, and understand, the safety aspects of the job.
6) that communications drills between members of the work team have been adequately rehearsed and all communications equipment is functioning.
7) that a rescue plan is in place to get a person down if they are left suspended after a fall.
8) that emergency transport is permanently available for use on site.
5.5 Pre-Work Checks
5.5.1 Before work commences, the supervisor in charge of the work shall ensure:
1) that all necessary permits have been obtained.
2) that all necessary electrical, mechanical and process inflations have been positively carried out.
3) that all static, moving, lifting and anchoring equipment, integral to the means of access and high structure, inclusive of those associated with the work task, are corers and high structure, inclusive of access and high structure, inclusive of those associated with the work tack, are correctly fitted, conditionally sound and fit for the intended purpose.
4) that all personnel have been provided with the required personal protection.
5) that all personnel have been briefed in, and understand, the safety aspects of the job.
6) that communications drills between members of the work team have been adequately rehearsed and all communications equipment is functioning.
7) that a rescue plan is in place to get a person down if they are left suspended after a fall.
8) that emergency transport is permanently available for use on site.