A risk meter will indicate the severity of the risk involved in each case. Red indicates a greater severity than yellow on the meter.The indicator will point to green after all the cases are solved and this will unlock the final assessment
A risk meter will indicate the severity of the risk involved ineach case. Red indicates a greater severity than yellow on the meter.The indicator will point to green after allthe cases are solved and this will unlock the final assessment