Within the list of alternative projects, three were
selected to test MULINO-DSS (Figure 4):
1. excavation of a tributary, the Meolo river, in order to increase the water retention time (R1).
2. plantation of a buffer strip of trees along one of the main rivers of the catchment, the Vallio river (R2).
3. redirection of the discharge of an area from the Vallio river into the Candellara canal that drains outside the lagoon (R3).