Within the intervention phase, significant variability can be observed. The level
increases from the baseline of 3% problems solved correctly to an intervention phase level of
55% problems solved correctly. A best-fit line for the intervention phase would show an almost
linear progression in problems solved correctly with the exception of two data points, which were not far from the best fit line.