There are a total of 8 workstations; the AC Room, After Cure Area, Before Cure Area, AC5, AC Control Room,
TC/Vacuum Storage Area, Parking Bay and Information Board. The arrow diagram shows the total number of
retention, conveyance, and processing and inspection station in the production floor. Through this diagram, the
sequence of jobs performed by the operators can be seen clearly. The total manual working time obtained is 179.54
minutes, automated machine time is 51.60 minutes and walking time is 52.20 minutes. Based on the standardised
work sheet, the operators had to wait for the curing cycle to complete before carrying on his job cycle