The earlier that defects are injected and the longer they remain in the product, the harder they are to find and fix. Thus, the longer you delay inspecting a product, the langer the volume of incorrect work, and the longer it will take to find and fix the problems. So start doing inspections at the beginning of the project and keep doing them until all the product elements have been developed and inspected.