Additionally, the area of cycle 1 and 2 was measured to calculate cohesiveness which was determined as the total positive work done in cycle two divided by the total positive work done in cycle one.
Additionally, the area of cycle 1 and 2 was measured to calculate cohesiveness which was determined as the total positive work done in cycle two divided by the totalpositive work done in cycle one.