Real-time Production Optimization
Solutions for Well, Reservoir and Field
Weatherford’s production optimization division delivers agile, well-supported products and services that foster innovative approaches to optimizing production which help companies work better, smarter, and faster. Each system is part of a “best of breed” philosophy that allows us to provide only top-quality integrated solutions. The affirmation of our success is the 150,000 plus wells that are currently operating with Weatherford production optimization products and services.
Comprehensive solutions.
Weatherford’s production optimization division, founded in 2001, has experienced exponential growth since its inception through both an aggressive acquisition program and organic growth of core products and services. Combining the technology and engineering expertise from CAC®, Edinburgh Petroleum Services (EPS), Case Services, Muse Measurements, Brisco® Engineering and Sicom positions Weatherford as a premier solutions provider in the industry. The company is recognized as a world leader in the design and manufacture of safety control and automation systems for wellhead and process applications. Intrinsic growth and support from our parent company, Weatherford, facilitated the establishment of manufacturing and service facilities located in each of the oil-rich areas of the world, providing regional support worldwide.
Unmatched depth and breadth of solutions for green and brown fields.
Weatherford provides solutions that increase production and lower lifting costs. The company offers a wide range of products including remote terminal units (RTUs), flow metering, controllers, a full suite of permanent downhole gauges, optical sensing systems, communication systems, SCADA, subsea and workover control solutions, artificial lift analysis, operations management, and production and field management software. Based on your needs, these products are combined to create the best solution to optimize production of your assets. Optimization has a solid business case for newly drilled wells as well as assets that are reaching decline phases.