Facility location model development is an important research area. In post disaster situations, the affected nodes needs to be allocated to the best facility so that relief is delivered to a particular demand point with minimum time, minimum probability of path failure, maximum path capacity between allocated facility and demand points, maximum availability of resources, balanced facility capacity and expected demand at the demand points.