Review Report on WTG
Foundation Design
for Thailand WED 60MW
Wind Power Project
(V3.0)
13th Jun. 2015
1
Contents
1. Brief Introduction........................................................................................................... 4
1.1 Project Overview........................................................................................................ 4
1.2 Review Reference...................................................................................................... 4
1.3 Results of Foundation Design.................................................................................. 5
1.3.1 Design Load ........................................................................................................ 5
1.3.2 Foundation Type................................................................................................ 5
1.3.3 Design Results .................................................................................................... 6
1.4 General Evaluation ................................................................................................... 6
2. Review on Engineering Geology ................................................................................ 7
2.1 Foundation Type....................................................................................................... 7
2.2 Groundwater............................................................................................................. 7
2.3 Foundation Excavation ............................................................................................ 7
3. Review on Structural Design...................................................................................... 7
3.1 Value of Design Anti-floating Water Level.............................................................. 7
3.2 Review on Foundation Stability .............................................................................. 8
3.3 Review on Zero-pressure Area Ratio of Foundation Bottom Mat ........................ 8
3.4 Bottom Reinforcement of Foundation Base ........................................................... 8
3.4.1 Radial Reinforcment.......................................................................................... 8
3.4.2 Annular Reinforcement.......................................................... 9
3.5 Top Reinforcement of Foundation ........................................................................ 12
3.5.1 Radial Reinforcement ...................................................................................... 12
3.5.2 Annular Reinforcement .................................................................................. 14
3.6 Dowel Bars for Anchor Bolts ................................................................................. 17
3.6.1 Bolt Bottom Horizontal Reinforcement ......................................................... 17
3.6.2 Bolt Bottom Vertical Reinforcement.............................................................. 18
3.6.3 Optimization .................................................................................................... 18
3.7 Erection Rebars ...................................................................................................... 18
3.8 Grout recommendations........................................................................................ 19
3.9 Bolt Related Comments ......................................................................................... 21
2
3.10 Foundation Corrosion Protection........................................................................ 22
3.11 Temperature Control Measures ........................................................................... 22
3.12 Settlement and Inclination .................................................................................. 23
3.13 Secondary Concrete Casting ................................................................................ 23
3.14 Anchor Bolt Waterproof Sealing Measures......................................................... 23
3.15 Pile length proposal .............................................................................................. 24
3.15.1 Geotechnical parameters calculation ............................................................ 24
3.15.2 Finite Element Analysis Model ..................................................................... 24
3.15.3 Pile length Calculation................................................................................... 25
3.15.4 Review and Analysis ...................................................................................... 25
3.15.5 PROPOSAL FOR T02 AND T03 ................................................................... 26
3.16 Requirement on Driving Piles into Bearing Platform and Structural Measures
...................................................................................................................................... 27
4 Conclusion................................................................................................................. 28
4.1 Bottom annular bars proposal (BTR5/6/7): ......................................................... 28
4.2 Top annular bars proposal (TTR3/4/5): .............................................................. 28
4.3 Top and bottom radial reinforcement .............................................................. 29
4.4 Bolt surrounding bars (BR4): ........................................................................... 29
4.5 Erection Rebars.................................................................................................. 29
4.6 Pile length proposal ........................................................................................... 29
4.7 Summarizes.......................................................................................................... 29
3
4
1. Brief Introduction
1.1 Project Overview
The Project is located in Huaybong, Dankhuntod District, Nakhonratchasima
Province Thailand and is comprised of 30 Gamesa G114-2.0MW T125m IEC
IIIA turbines with hub heights of 125 meters. It has a total installed capacity of
60MW.
1.2 Review Reference
[1] JLP Engineering Services Co., Soil Investigation, Wind Turbine 60 MW
Power Plant, Huaybong, Dankhuntod, Nakhonratchasima, August 2014.
[2] Gunkul Engineering Public Co., Ltd., WED-STR-D-01~013, Foundation
Drawings of Wind turbine generator..Dated 12 January2015.
[3] Gamesa, Design Loads G114 Opt and Definition of Interfaces,
G114-2.0MW T125m Iec ..A Foundation Loads, 16 April 2014.
[4] Gunkul Engineering Public Co., Ltd., Detail Design Calculation Location
T16, 24 October 2014.
[5] Gamesa, G114 2.0MW STD2 125m Opt Foundation(125.1),
Ref.:A12-07-NI029 V1.0, 11 August 2014.
[6] Gamesa, Foundation Base Flange Leveling System, Drawing No.
GD150950, Revision R0, Sheet 1, Dated 21 November 2011.
[7] Gamesa, Threaded Bar D36 (M39) 10.9 HDG L3000, Drawing No.
GD200895, Revision R1, Sheet 1, Dated 25 September 2012.
[8] Utility Design Consulants CO.,Ltd., Wind Turbine Foundation Design
Calculation, Rev.00 Date 14.08.11.
[9] Utility Design Consulants CO.,Ltd., Pile foundation Design For Gunkul
Wed Project, 16 November 2014.
[10] DNV GL, Technical Review of the Foundation Design, Document
No.:170425-USSD-R-01, Dated 30 January 2015.
5
[11] IEC 61400-1:2005(E),Wind turbines, Third edition, August 2005.
[12] Euro 2004 code.
[13] Gamesa, Thailand Gunkul Foundation Calculation Report to
Proposals( Rev: 2), Dated JUN 8, 2015.
[14] Gamesa, GUNKUL_INTERFACE_CALCULATION_CLARIFICATION.
1.3 Results of Foundation Design
1.3.1 Design Load
Based on the load data of G114-2.0MW T125m ..A WTG as provided by
Gamesa, see Table 1 for the loads transferred from the upper part of the WTG
to the bottom of the tower and the contact face of the foundation ring. A safety
coefficient is not considered in the value for the load of a WTG foundation.
Table 1.3-1 List of WTG Foundation Loads
Load Case Fx or Fr(kN) Fy(kN) Fz(kN) Mx or Mr(kNm) My(kNm) Mz(kNm)
Normal operation
condition
431.31 0 4586.58 52074.34 0 1973.8
Extreme condition 1126.31 123.54 4542.94 136687.01 0 287.46
1.3.2 Foundation Type
In this wind farm, two types of WTG foundations are adopted, which are
spread foundation (Type A and Type B) and pile foundation (Type C). Type A
spread foundation is set directly on a natural ground as its load bearing
stratum and therefore, is suitable for the wind turbines located at a shallow
load bearing stratum. The load bearing stratum is comprised of medium dense
to very dense silty sand and very dense silty sand. For Type B spread
foundation, the ground should be treated by soil replacing method before it
could serve as the load bearing stratum. Generally, the natural ground at the
bottom of the foundation contains very loose silty sand, very loose to loose
silty sand and loose silty sand yet the loose sandy soil is of small thickness. As
such, the natural foundation fails to meet the requirement on the load bearing
capacity of a foundation and thus, the soil should be replaced and new
materials should be filled in to meet the standard. Type C foundation uses
6
precast concrete piles, which suits the condition with thick loose sandy soil
layer, and thus could be used for the WTG whose load bearing stratum is
deeply buried.
1.3.3 Design Results
For a spread foundation, the concrete strength is fc
..=400KSC (Cylinder
at 28 day). The foundation is divided into two parts. The upper part is a
cylinder which is 1.5m high and 5.5m in diameter and the lower part is an
approximate cylinder, with the bottom diameter of around 22.0m, a max.
height of 3.0m and a min. height of 0.5m. The WTG foundation is 4.5m high
in total and has a buried
รายงานการสอบทานใน WTG
ออกแบบมูลนิธิ
ไทยพุธ 60MW โครงการผลิตไฟฟ้าพลังงานลม(V3.0) 13 มิถุนายน 2015 1 สารบัญ1 สั้น 4 1.1 โครงการ 4 1.2 ทบทวน 4 1.3 ผลของการออกแบบมูลนิธิ ............................................ ...................................... 5 1.3.1 โหลดการออกแบบ 5 มูลนิธิ 1.3.2 ประเภท ............................................ .................................................. .. 5 1.3.3 ผลการออกแบบ .......................................... .................................................. ........ 6 1.4 การประเมินผลทั่วไป ...................................... .................................................. ........... 6 2. ทบทวนวิศวกรรมธรณีวิทยา ................................ ................................................ 7 2.1 มูลนิธิ 7 2.2 7 2.3 มูลนิธิขุด .............................................. .............................................. 7 3. สอบทาน ในการออกแบบโครงสร้าง ............................................... ....................................... 7 3.1 มูลค่าของการออกแบบป้องกันลอยระดับน้ำ .................................................. ........... 7 3.2 ทบทวนมูลนิธิเสถียร ................................. ............................................. 8 3.3 ทบทวนศูนย์ -pressure อัตราส่วนพื้นที่ของมูลนิธิจ้าล่าง ........................ 8 3.4 การเสริมแรงด้านล่างของฐานมูลนิธิ ........... ................................................ 8 3.4 0.1 Radial 8 3.4.2 เสริมสร้างวงแหวน ............................................ .............. 9 3.5 ด้านการเสริมแรงของมูลนิธิ .............................. .......................................... 12 3.5.1 รัศมีการเสริมแรง .. .................................................. .................................. 12 3.5.2 เสริมสร้างวงแหวน .......... .................................................. ...................... 14 3.6 เดือยบาร์สำหรับสลักเกลียว ..................... .................................................. .......... 17 3.6.1 กลอนล่างเสริมแนวนอน ................................ ......................... 17 3.6.2 กลอนล่างเสริมแนวตั้ง ................. ............................................. 18 3.6.3 การเพิ่มประสิทธิภาพ .................................................. .................................................. 18 3.7 Rebars ติดตั้ง 18 3.8 ยาแนว 19 3.9 กลอนความคิดเห็นที่เกี่ยวข้อง ............................................. ............................................ 21 2 3.10 มูลนิธิป้องกันการกัดกร่อน .................................................. ...................... 22 3.11 มาตรการควบคุมอุณหภูมิ ....................... .................................................. .. 22 3.12 อ้างอิงและเอียง ........................................... ....................................... 23 3.13 หล่อคอนกรีตรอง ...... .................................................. ........................ 23 3.14 Anchor Bolt มาตรการซีลกันน้ำ ................... ...................................... 23 3.15 ข้อเสนอระยะเวลาในกอง ....... .................................................. ..................................... 24 3.15.1 การคำนวณค่าพารามิเตอร์ปฐพี ...... .................................................. .... 24 3.15.2 การวิเคราะห์องค์ประกอบ จำกัด รุ่น ...................................... ............................... 24 3.15.3 ระยะเวลาในการคำนวณเสาเข็ม ............ .................................................. ..................... 25 3.15.4 การทบทวนและวิเคราะห์ ...................... .................................................. .............. 25 3.15.5 ข้อเสนอสำหรับ T02 และ T03 ........................... ........................................ 26 3.16 ความต้องการในการขับรถเข้ามาในกองแพลตฟอร์มแบริ่งและ โครงสร้าง 27 4 28 4.1 บาร์วงแหวนล่างข้อเสนอ (BTR5 / 07/06): .................................... ..................... 28 4.2 บาร์วงแหวนยอดนิยมข้อเสนอ (TTR3 / 05/04): ............... ............................................... 28 4.3 ยอดนิยม และการเสริมแรงรัศมีด้านล่าง .............................................. ................ 29 4.4 กลอนรอบบาร์ (BR4) ......................... .................................................. 29 4.5 เซนติเมตร 29 ข้อเสนอ 4.6 ความยาวเสาเข็ม ............................................. .............................................. 29 4.7 29 3 4 1. บทสรุปเบื้องต้น1.1 ภาพรวมของโครงการโครงการตั้งอยู่ในห้วยบง, ด่านขุนทดจังหวัดนครราชสีมาและจังหวัดประกอบด้วย 30 Gamesa G114-2.0MW T125m IEC กังหัน IIIA ที่มีความสูงศูนย์กลางของ 125 เมตร แต่ก็มีกำลังผลิตติดตั้งรวมของ60MW. 1.2 ทบทวนอ้างอิง[1] JLP Engineering Services Co. , สืบสวนดิน, กังหันลมผลิตไฟฟ้า 60 เมกะวัตต์โรงไฟฟ้าห้วยบง, ด่านขุนทดนครราชสีมาสิงหาคม 2014 [2] กันกุลเอ็นจิเนียริ่ จำกัด . นำ-STR-D-01 ~ 013 มูลนิธิภาพวาดของกังหันลม generator..Dated 12 January2015. [3] Gamesa, โหลดการออกแบบ G114 เลือกและความหมายของการเชื่อมต่อ, G114-2.0MW T125m Iec หรอกมูลนิธิโหลด 16 เมษายน 2014 [4] กันกุลเอ็นจิเนียริ่ จำกัด การออกแบบรายละเอียดการคำนวณที่อยู่T16, 24 ตุลาคม 2014 [5] Gamesa, G114 2.0MW STD2 125m เลือกมูลนิธิ (125.1) Ref:. A12-07-NI029 V1.0, 11 สิงหาคม 2014 [6] Gamesa ฐานมูลนิธิแปลนระบบ Leveling วาดฉบับที่GD150950, Revision R0 แผ่นที่ 1 ลงวันที่ 21 พฤศจิกายน 2011 [7] Gamesa, บาร์เกลียว D36 (M39) 10.9 HDG L3000, การวาดภาพครั้งที่GD200895, Revision R1 แผ่นที่ 1 ลงวันที่ 25 กันยายน 2012 [8] การออกแบบยูทิลิตี้ Consulants CO., Ltd., กังหันลมมูลนิธิออกแบบคำนวณ Rev.00 วันที่ 14.08.11. [9] ยูทิลิตี้การออกแบบ Consulants CO จำกัด รากฐานเสาเข็มออกแบบสำหรับกุล. โครงการ Wed, 16 พฤศจิกายน 2014 [10] DNV GL, เทคนิคการสอบทานของการออกแบบมูลนิธิเอกสารเลขที่: 170425-USSD-R-01 ลงวันที่ 30 มกราคม 2015 5 [11] IEC 61400-1: 2005 (E), กังหันลมรุ่นที่สามสิงหาคม 2005 [12] ยูโร 2004 รหัส. [13] Gamesa ประเทศไทยกุลมูลนิธิเพื่อรายงานการคำนวณข้อเสนอ (เรฟ: ที่ 2) ลงวันที่ 8 มิถุนายน 2015 [14] Gamesa, GUNKUL_INTERFACE_CALCULATION_CLARIFICATION. 1.3 ผลของการออกแบบมูลนิธิ1.3.1 โหลดการออกแบบบนพื้นฐานของข้อมูลภาระของ G114-2.0MW T125m หรอก WTG ให้เป็นไปตามGamesa, ดูตารางที่ 1 สำหรับโหลดโอนจากส่วนบนของ WTG ไปที่ด้านล่างของหอและใบหน้าของแหวนติดต่อมูลนิธิ ความปลอดภัยสัมประสิทธิ์จะไม่ถือว่าเป็นความคุ้มค่าในการโหลดของมูลนิธิ WTG. ตารางที่ 1.3-1 รายชื่อโหลด WTG มูลนิธิโหลดกรณี Fx หรือ Fr (กิโลนิวตัน) ปีงบประมาณ (กิโลนิวตัน) Fz (กิโลนิวตัน) หรือนาย Mx (KNM) ของฉัน ( KNM) Mz (KNM) การทำงานปกติสภาพ431.31 4,586.58 52,074.34 0 0 1,973.8 สภาพมาก 1,126.31 123.54 4,542.94 287.46 136,687.01 0 มูลนิธิ 1.3.2 ประเภทในฟาร์มกังหันลมนี้ทั้งสองประเภทของฐานราก WTG เป็นบุตรบุญธรรมซึ่งมีการแพร่กระจายของมูลนิธิ (ชนิดและประเภท B) และมูลนิธิกอง (Type C) พิมพ์รากฐานการแพร่กระจายเป็นที่ตั้งอยู่บนพื้นดินธรรมชาติเป็นแบกภาระของชั้นและดังนั้นจึงเหมาะสำหรับกังหันลมอยู่ที่ตื้นโหลดชั้นแบริ่ง ชั้นแบกภาระประกอบด้วยหนาแน่นปานกลางทรายปนทรายแป้งหนาแน่นมากและหาดทรายปนทรายแป้งหนาแน่นมาก สำหรับประเภทการแพร่กระจาย B มูลนิธิพื้นดินควรจะได้รับการรักษาโดยการเปลี่ยนวิธีการดินก่อนที่จะสามารถใช้เป็นชั้นแบกภาระ โดยทั่วไปพื้นดินธรรมชาติที่ด้านล่างของมูลนิธิมีทรายปนทรายแป้งหลวมมากมากหลวมหลวมทรายปนทรายแป้งและหาดทรายปนทรายแป้งหลวมยังดินปนทรายหลวมของความหนาขนาดเล็ก ในฐานะที่เป็นเช่นนี้มูลนิธิธรรมชาติล้มเหลวในการตอบสนองความต้องการในการแบกภาระความจุของมูลนิธิและทำให้ดินควรจะถูกแทนที่และใหม่วัสดุที่ควรจะเต็มไปในมาตรฐาน ประเภทใช้รากฐาน C 6 กองคอนกรีตสำเร็จรูปที่เหมาะสมกับสภาพดินทรายหนาหลวมชั้นและทำให้สามารถใช้สำหรับ WTG มีภาระแบกชั้นถูกฝังลึก. 1.3.3 ผลการออกแบบสำหรับการวางรากฐานการแพร่กระจายความแข็งแรงคอนกรีต fc .. = 400KSC (กระบอกที่ 28 วัน) รากฐานที่จะแบ่งออกเป็นสองส่วน ส่วนบนเป็นทรงกระบอกซึ่งเป็น 1.5 เมตรสูงและ 5.5m ในเส้นผ่าศูนย์กลางและส่วนล่างเป็นรูปทรงกระบอกโดยประมาณมีขนาดเส้นผ่าศูนย์กลางด้านล่างของรอบ 22.0m, แม็กซ์. ความสูงของ 3.0m และนาที ความสูงของ 0.5 รากฐาน WTG เป็น 4.5m สูงทั้งหมดและได้ฝังอยู่