soil compaction for dike(full height)
leveling
leveling and compaction internal area
compaction-subbase of road
laterite included compaction
imported laterite (10 trips/day)
compaction laterite
crushed stone included compact (15 cm)
imported crushed stone
compaction crushed stone
road on dike
pond
pond excavation
move the soil from pond to outside