1. Operations to be carried out every two months:
- Check the efficiency of electrical contacts inside the panels, also checking the cleanliness of parts under voltage, the fixing of nuts and bolts closing the contacts, the good state of power and signal wires, general cleanliness inside the panel.
- Check and, if necessary, tighten the nuts and bolts clamping the ends of all wires and electrical components inside the transformer cabins and oscillating circuits (opened with the special key for doors of the drier booth), the state of power wires, cleanliness inside the cabins, the fixing of bolts clamping the inductances and the laminated strips of tombac.
- Check, and if necessary, fix the bolts clamping the inductances and those clamping the laminated strips inside the drier booth.