I hope you are fine.
As you also know, Civil engineer want to know about the cable opening between the cable floor and MCC room or
All other entries for the cabling between floors.
We can give him some information for the previous projects, but if the arrangement changes, we must
Destroy some part again. Therefore , we need this from AEE.
Please find the Turbine Building plan inside the attachment.
Could you please inform me, what happened in the meeting with AEE.
AEE ( or panel supplier ) shall give us panel arrangement with dimension and drawing inside
The Turbine Building and give us these Openings specification.
Could you please clarify this with AEE ?
( I can clarify this with AEE also, But I don’t know what happened, about the contract between AEE and LAWI )
If you need any information in this regard, please let me know.