(b) Job identification stating the purpose of the job.
(c) Contractor’s personnel providing the service, and dates and time of
departure and return from the job.
(d) Lessons learned.
(e) Conclusion and recommendations.
(f) Materials and equipment cost (daily and total for well).
(g) Job plans and job execution summaries.
(h) Downtime statistics and details of same.
(i) Equipment and materials shipped to the platform identifying both the
dates delivered to the platform and the date returned to the
Contractor.
(j) Job log.
1.5.2 Quarterly Report
Contractor shall provide a report to the Company’s Representative with the
following data at the end of every 3 months during the Term of the Contract.
(a) A summary of invoices generated per AFE and well name. The
summary shall list the invoice number, amount, date submitted, and
show a cumulative sum of the invoice. The cumulative sum is
expected to be maintained by the Contractor for the Term of the
Contract.
(b) The cost detail for this report will be specific. The cost per invoice
will be itemized as per the following categories:
Monthly Operating Rate and time at rate
Zero rate time allocations
Stack Rate (with or without crews) and time at rate
1.5.3 Supplier Quality Meeting
Contractor shall participate in a supplier quality meeting with Company four
(4) times per year. The meeting shall focus on both operational learning and
areas for improved service.
2. COUNTRY
The Kingdom of Thailand