The field indicates the cost driver to use when a costing component or การแปล - The field indicates the cost driver to use when a costing component or ไทย วิธีการพูด

The field indicates the cost driver

The field indicates the cost driver to use when a costing component or costing element is calculated.
For a detailed description of each cost driver per costing component, see the document Costing Components and Cost Drivers in M3 Product Costing in the M3 Key Process Documentation.
Alternatives
For components A01–A03 (material costs):
Blank = No selection possible.
For components A04–A05 (material costs):
41 = Order-initiated portion of the purchase costing.
97 = Distribution cost for distributed items, applied when check box 22 ‘Split cost into costing components’ is selected in (PCS001/F). For details, see document Configure Basic Product Costing Settings in the M3 Key Process Documentation.
99 = Material overhead (percentage).
For components B01–B14 (operation costs):
= VOLUME-BASED COST DRIVERS:
1 = Machine time—production.
2 = Labor time—production.
3 = Total machine time (both production and setup, 1 above + 41 below).
4 = Total labor time (both production and setup, 2 above + 42 below).
5 = Unit produced. (The cost is multiplied by a production factor which can be specified for each operation.)
6 = Weight unit produced. (The initial weight which can be specified for the operation is used to find out the weight.)
7 = Order multiple.
8 = Cost multiplication unit. (The multiplier is specified in the operation.)
9 = Volume produced. (Volume is specified in the operation.)
99 = Percent.
= ORDER-INITIATED COST DRIVERS:
41 = Machine time (internal setup time).
42 = Labor time (internal and external setup time).
43 = Cost per operation.
44 = Cost per material line in the structure which is connected to the operation.
45 = Transport distance to the next work center. (The distance specified in the transport table is used.)
48 = Cost multiplication unit. (The multiplier is specified in the operation.)
For components C01–C02 (tools costs):
= VOLUME-BASED COST DRIVERS:
1 = Machine time.
2 = Price per tool punch. (The quantity is divided by the value in the field for number of items per punch that is defined for the tool.
= ORDER-INITIATED COST DRIVERS:
41 = Per operation performed.
For component D01 (subcontracting costs):
Blank = No selection possible.
For component D02 (subcontracting overhead costs):
41 = Order-initiated portion of the purchase costing.
99 = Subcontracting overhead (percentage).
For components E01–E10 (product overhead costs):
= VOLUME-BASED COST DRIVERS:
1 = Gross weight.
2 = Volume.
3 = Quantity in basic unit of measure.
4 = Lead time with capital tied up. Formula: lead time * percent * sum of A, B, C and D components / no. of workdays during the year. The cost driver is specified in percent.
5 = Average inventory formula: average inventory. * price / annual demand. The cost driver is specified in percent.
6 = Structure complexity, that is, the cost per complexity unit. The number of units is specified in (PDS001 - Product Structure. Open).
7 = User-defined field 2 in the item file.
95 = Margin amount, that is, the difference between the cost price and the sales price on a work order.
96 = Invoice matching difference.
97 = Distribution cost for distributed items, applied when check box 22 ‘Split cost into costing components’ is selected in (PCS001/F). For details, see document Configure Basic Product Costing Settings in the M3 Key Process Documentation.
98 = Uplift (change of standard cost) for distributed items. This cost driver is updated when (DPS290 - Distribution Costing. Calc Selection) is run, provided that the Move component values setting is selected in (DPS290/E - Distribution Costing. Calc Selection).
99 = Percent.
= ORDER-INITIATED COST DRIVERS:
41 = Cost per lead time day.
42 = Ordering cost (cost per order).
43 = Number of material lines in the structure. (The rate is multiplied by the number of lines.)
44 = Number of operation lines (excluding subcontract) in the structure, that is, the cost per operation. (The rate is multiplied by the number of lines.)
45 = Number of subcontract operation lines in the structure, that is, the cost per subcontract operation. (The rate is multiplied by the number of lines.)
46 = Structure complexity - see cost driver 6 above.
0/5000
จาก: -
เป็น: -
ผลลัพธ์ (ไทย) 1: [สำเนา]
คัดลอก!
ฟิลด์นี้บ่งชี้ว่า โปรแกรมควบคุมต้นทุนจะใช้เมื่อคำนวณต้นทุนส่วนประกอบ หรือองค์ประกอบคำนวณต้นทุนจะคำนวณสำหรับคำอธิบายโดยละเอียดของแต่ละโปรแกรมควบคุมต้นทุนต่อส่วนทุน ดูเอกสารประกอบคำนวณต้นทุนและควบคุมต้นทุนในทุนผลิตภัณฑ์ M3 ใน M3 คีย์เอกสารกระบวนการทางเลือกสำหรับคอมโพเนนต์ A01-A03 (วัสดุต้นทุน):ว่าง =เลือกไม่ได้สำหรับคอมโพเนนต์ A04-A05 (วัสดุต้นทุน):41 =ส่วนเริ่มต้นลำดับของการคำนวณต้นทุนซื้อ97 =ต้นทุนการกระจายสินค้าสำหรับกระจายสินค้า ใช้เมื่อเลือก 22 กล่องกาเครื่องหมาย 'ต้นทุนแบ่งเป็นทุนประกอบ' (PCS001/F) สำหรับรายละเอียด ดูเอกสารตั้งค่าคอนฟิกผลิตภัณฑ์ต้นทุนการตั้งค่าพื้นฐานในเอกสารกระบวนการคีย์ M399 =วัสดุค่าใช้จ่าย (เปอร์เซ็นต์)สำหรับส่วนประกอบที่ B01-B14 (ต้นทุนการดำเนินงาน): = ปริมาณการควบคุมต้นทุน:1 =เวลาเครื่องจักรซึ่งผลิต2 =เวลาแรงงานซึ่งผลิต3 =เครื่องรวมเวลา (ผลิตและติดตั้ง 1 ข้าง + 41 ด้านล่าง)4 =เวลาแรงงานรวม (ทั้งผลิตและติดตั้ง 2 ข้าง + 42 ด้านล่าง)5 =หน่วยที่ผลิต (ต้นทุนคูณ ด้วยปัจจัยการผลิตซึ่งคุณสามารถระบุสำหรับแต่ละการดำเนินการ)6 =น้ำหนักหน่วยผลิต (น้ำหนักเริ่มต้นซึ่งคุณสามารถระบุการดำเนินงานจะใช้เพื่อหาน้ำหนัก)7 =สั่งหลาย8 =ต้นทุนต่อหน่วยคูณด้วย (ตัวคูณที่มีระบุการดำเนินการ)9 =ปริมาณที่ผลิต (ปริมาณผลิตการดำเนินงาน)99 =เปอร์เซ็นต์การ = สั่งเริ่มต้นควบคุมต้นทุน:41 =เวลาเครื่อง (ติดตั้งภายในเวลา)42 =เวลาแรงงาน (เวลาติดตั้งภายใน และภายนอก)43 =ต้นทุนต่อการดำเนินงาน44 =ต้นทุนต่อรายการวัสดุโครงสร้างที่เชื่อมต่อกับการดำเนินการ45 =ระยะทางขนส่งที่ศูนย์ควบคุมงานต่อไป (ระยะทางที่ระบุในตารางการขนส่งการผลิต)48 =ต้นทุนต่อหน่วยคูณด้วย (ตัวคูณที่มีระบุการดำเนินการ)สำหรับคอมโพเนนต์ C01-C02 (ต้นทุนเครื่องมือ): = ปริมาณการควบคุมต้นทุน:1 =เวลาเครื่อง2 =ราคาต่อเครื่องมือเจาะ (ปริมาณจะถูกหาร ด้วยค่าในฟิลด์หมายเลขสินค้าสำหรับแต่ละหมัดที่กำหนดสำหรับเครื่องมือ = สั่งเริ่มต้นควบคุมต้นทุน:41 =ต่อการดำเนินการคอมโพเนนต์ D01 (ต้นทุนรับเหมารายย่อย):ว่าง =เลือกไม่ได้คอมโพเนนต์ D02 (จ่ายรับเหมารายย่อย):41 =ส่วนเริ่มต้นลำดับของการคำนวณต้นทุนซื้อ99 = Subcontracting โสหุ้ย (เปอร์เซ็นต์)สำหรับคอมโพเนนต์ E01-E10 (ผลิตภัณฑ์จ่าย): = ปริมาณการควบคุมต้นทุน:1 =น้ำหนัก2 =ระดับเสียง3 =ปริมาณในหน่วยวัดพื้นฐาน4 =เวลารอคอยสินค้า ด้วยทุนที่เชื่อมโยงถึงกัน สูตร: ระยะเวลา * ร้อยละ * ผลรวมของส่วนประกอบ A, B, C และ D / ไม่ ของวันทำงานในระหว่างปี ควบคุมต้นทุนผลิตร้อยละ5 =คงสูตร: คง * ราคา / ปีความต้องการ ควบคุมต้นทุนผลิตร้อยละ6 =โครงสร้างซับซ้อน คือ ต้นทุนต่อหน่วยพื้นที่ จำนวนของหน่วยที่ระบุไว้ใน (PDS001 - โครงสร้างผลิตภัณฑ์ เปิด)7 =ผู้ใช้กำหนดเขตข้อมูล 2 แฟ้มสินค้า95 =ยอดกำไร ที่ ความแตกต่างระหว่างราคาต้นทุนและราคาขายในใบสั่งผลิต96 =ความแตกต่างของการจับคู่ใบแจ้งหนี้97 =ต้นทุนการกระจายสินค้าสำหรับกระจายสินค้า ใช้เมื่อเลือก 22 กล่องกาเครื่องหมาย 'ต้นทุนแบ่งเป็นทุนประกอบ' (PCS001/F) สำหรับรายละเอียด ดูเอกสารตั้งค่าคอนฟิกผลิตภัณฑ์ต้นทุนการตั้งค่าพื้นฐานในเอกสารกระบวนการคีย์ M398 = uplift (เปลี่ยนแปลงต้นทุนมาตรฐาน) สำหรับกระจายสินค้า มีการปรับปรุงโปรแกรมควบคุมต้นทุนนี้เมื่อ (DPS290 - กระจายการคำนวณต้นทุน เลือกคำนวณ) รัน ได้ค่าคอมโพเนนต์ย้ายที่ตั้งไว้ใน (DPS290/E - กระจายการคำนวณต้นทุน คำนวณการเลือก)99 =เปอร์เซ็นต์การ = สั่งเริ่มต้นควบคุมต้นทุน:41 =ต้นทุนต่อลูกค้าเป้าหมายวันเวลา42 =ต้นทุนการสั่งซื้อ (ต้นทุนต่อใบสั่ง)43 =จำนวนรายการวัสดุในโครงสร้าง (อัตราคูณ ด้วยจำนวนของบรรทัด)44 =หมายเลขของบรรทัดการดำเนินการ (ไม่รวมสัญญา) ในโครงสร้าง คือ ต้นทุนต่อการดำเนินงาน (อัตราคูณ ด้วยจำนวนของบรรทัด)45 =หมายเลขของสัญญาการดำเนินงานบรรทัดในโครงสร้าง คือ ต้นทุนต่อการดำเนินการสัญญาช่วง (อัตราคูณ ด้วยจำนวนของบรรทัด)46 =ความซับซ้อนของโครงสร้าง - ควบคุมดูต้นทุนข้างต้น 6
การแปล กรุณารอสักครู่..
ผลลัพธ์ (ไทย) 2:[สำเนา]
คัดลอก!
The field indicates the cost driver to use when a costing component or costing element is calculated.
For a detailed description of each cost driver per costing component, see the document Costing Components and Cost Drivers in M3 Product Costing in the M3 Key Process Documentation.
Alternatives
For components A01–A03 (material costs):
Blank = No selection possible.
For components A04–A05 (material costs):
41 = Order-initiated portion of the purchase costing.
97 = Distribution cost for distributed items, applied when check box 22 ‘Split cost into costing components’ is selected in (PCS001/F). For details, see document Configure Basic Product Costing Settings in the M3 Key Process Documentation.
99 = Material overhead (percentage).
For components B01–B14 (operation costs):
= VOLUME-BASED COST DRIVERS:
1 = Machine time—production.
2 = Labor time—production.
3 = Total machine time (both production and setup, 1 above + 41 below).
4 = Total labor time (both production and setup, 2 above + 42 below).
5 = Unit produced. (The cost is multiplied by a production factor which can be specified for each operation.)
6 = Weight unit produced. (The initial weight which can be specified for the operation is used to find out the weight.)
7 = Order multiple.
8 = Cost multiplication unit. (The multiplier is specified in the operation.)
9 = Volume produced. (Volume is specified in the operation.)
99 = Percent.
= ORDER-INITIATED COST DRIVERS:
41 = Machine time (internal setup time).
42 = Labor time (internal and external setup time).
43 = Cost per operation.
44 = Cost per material line in the structure which is connected to the operation.
45 = Transport distance to the next work center. (The distance specified in the transport table is used.)
48 = Cost multiplication unit. (The multiplier is specified in the operation.)
For components C01–C02 (tools costs):
= VOLUME-BASED COST DRIVERS:
1 = Machine time.
2 = Price per tool punch. (The quantity is divided by the value in the field for number of items per punch that is defined for the tool.
= ORDER-INITIATED COST DRIVERS:
41 = Per operation performed.
For component D01 (subcontracting costs):
Blank = No selection possible.
For component D02 (subcontracting overhead costs):
41 = Order-initiated portion of the purchase costing.
99 = Subcontracting overhead (percentage).
For components E01–E10 (product overhead costs):
= VOLUME-BASED COST DRIVERS:
1 = Gross weight.
2 = Volume.
3 = Quantity in basic unit of measure.
4 = Lead time with capital tied up. Formula: lead time * percent * sum of A, B, C and D components / no. of workdays during the year. The cost driver is specified in percent.
5 = Average inventory formula: average inventory. * price / annual demand. The cost driver is specified in percent.
6 = Structure complexity, that is, the cost per complexity unit. The number of units is specified in (PDS001 - Product Structure. Open).
7 = User-defined field 2 in the item file.
95 = Margin amount, that is, the difference between the cost price and the sales price on a work order.
96 = Invoice matching difference.
97 = Distribution cost for distributed items, applied when check box 22 ‘Split cost into costing components’ is selected in (PCS001/F). For details, see document Configure Basic Product Costing Settings in the M3 Key Process Documentation.
98 = Uplift (change of standard cost) for distributed items. This cost driver is updated when (DPS290 - Distribution Costing. Calc Selection) is run, provided that the Move component values setting is selected in (DPS290/E - Distribution Costing. Calc Selection).
99 = Percent.
= ORDER-INITIATED COST DRIVERS:
41 = Cost per lead time day.
42 = Ordering cost (cost per order).
43 = Number of material lines in the structure. (The rate is multiplied by the number of lines.)
44 = Number of operation lines (excluding subcontract) in the structure, that is, the cost per operation. (The rate is multiplied by the number of lines.)
45 = Number of subcontract operation lines in the structure, that is, the cost per subcontract operation. (The rate is multiplied by the number of lines.)
46 = Structure complexity - see cost driver 6 above.
การแปล กรุณารอสักครู่..
ผลลัพธ์ (ไทย) 3:[สำเนา]
คัดลอก!
ข้อมูลบ่งชี้ว่าต้นทุนไดรเวอร์เมื่อชิ้นส่วนหรือองค์ประกอบต้นทุน ต้นทุนจะถูกคำนวณ
สําหรับรายละเอียดของแต่ละไดรเวอร์ส่วนประกอบต้นทุนต่อการดูเอกสารต้นทุนและค่าใช้จ่ายไดรเวอร์ส่วนประกอบใน M3 ต้นทุนผลิตภัณฑ์ใน M3 กระบวนการสำคัญเอกสาร องค์ประกอบ a01 –ทางเลือก

A01 ( ต้นทุน ) :
ว่างเปล่า =
เลือกไม่มีที่สุดสำหรับส่วนประกอบของ– A03 ( ต้นทุน ) :
41 = เพื่อเริ่มส่วนของการซื้อต้นทุน .
97 = กระจายต้นทุนการกระจายสินค้า ใช้เมื่อกล่องเช็ค 22 ' แยกต้นทุนในส่วนของการเลือก ( pcs001 / F ) สำหรับรายละเอียดดูเอกสารปรับแต่งการตั้งค่าพื้นฐานการคำนวณต้นทุนผลิตภัณฑ์ใน M3 กระบวนการสำคัญ เอกสารค่าใช้จ่าย 99 =

( ค่าวัสดุ )องค์ประกอบกระบวนการและ B14 ( ค่าใช้จ่ายปฏิบัติการ ) :
= volume-based ไดรเวอร์ค่าใช้จ่าย :
1 ครั้ง = เครื่องจักรการผลิต .
2 =
3 = เวลาแรงงานการผลิต รวมเวลาที่เครื่อง ( ทั้งการผลิตและการติดตั้ง 1 ข้างต้น 41 ด้านล่าง )
4 = รวมแรงงานเวลา ( ทั้งการผลิตและการติดตั้ง ข้างต้น 42 2 ด้านล่าง )
5 = หน่วยผลิต ( ต้นทุนคูณด้วยปัจจัยการผลิตซึ่งสามารถระบุสำหรับแต่ละการดำเนินงาน )
6 = น้ำหนักหน่วยผลิต ( น้ำหนักเริ่มต้นซึ่งสามารถกำหนดสำหรับการใช้เพื่อหาน้ำหนัก )
7 = สั่งหลาย .
8 หน่วย = ต้นทุนการคูณ ( ตัวคูณที่ระบุไว้ในการดำเนินงาน )
9 = ปริมาณที่ผลิต ( ปริมาณที่ระบุไว้ในการดำเนินงาน ) =

= 99 เปอร์เซ็นต์ order-initiated ไดรเวอร์ค่าใช้จ่าย :
41 = เวลาที่เครื่อง ( เวลาติดตั้ง
ภายใน )42 = แรงงานเวลา ( ภายในและภายนอกเวลาติดตั้ง ) .
43 = ค่าใช้จ่ายต่อการผ่าตัด
44 = ราคาต่อเส้นวัสดุในโครงสร้างที่เกี่ยวข้องกับการดำเนินงาน .
45 = การขนส่งระยะทางไปยังศูนย์งานต่อไป ( ระยะทางที่ระบุไว้ในตารางการขนส่งจะใช้ . )
48 = ต้นทุนการคูณ ( ตัวคูณที่ระบุไว้ในการดำเนินการ ส่วน C01 ( C02 )

( เครื่องมือต้นทุน )= volume-based ไดรเวอร์ค่าใช้จ่าย :
1 = เครื่องเวลา .
2 = ราคาต่อเจาะเครื่องมือ ( ปริมาณจะแบ่งตามค่าในเขตข้อมูลจำนวนรายการต่อ หมัดที่กำหนดไว้สำหรับเครื่องมือ .
=
= : 41 order-initiated ขับค่าใช้จ่ายต่อการผ่าตัด .
ส่วนประกอบ C10 ( รับเหมาช่วงค่าใช้จ่าย ) :

ว่าง = ไม่มีการเลือกเป็นไปได้ องค์ประกอบ d02 ( รับเหมาช่วงของต้นทุนค่าใช้จ่าย ) :
41 = เพื่อเริ่มการซื้อส่วนของต้นทุน ค่าใช้จ่ายในการรับเหมาช่วง ( ร้อยละ 99 =
)
ส่วนประกอบ e01 – PCC7942 ( ต้นทุนค่าใช้จ่ายผลิตภัณฑ์ ) :
= volume-based ไดรเวอร์ค่าใช้จ่าย :
1 = น้ำหนักรวม .
2 = ปริมาณ .
3 = ปริมาณในหน่วยพื้นฐานของการวัด .
4 = ระยะเวลากับ ทุนผูกขึ้น สูตร : ระยะเวลา * * เปอร์เซ็นต์รวมของ A , B , C และ D ส่วนประกอบ / หมายเลขของวันในระหว่างปีควบคุมต้นทุนถูกกำหนดในเปอร์เซ็นต์ .
5 = สูตรสินค้าคงคลังเฉลี่ย : สินค้าคงคลังเฉลี่ย * ราคา / ปี ความต้องการ ควบคุมต้นทุนถูกกำหนดในเปอร์เซ็นต์ .
6 = โครงสร้างที่ซับซ้อน นั่นคือ ต้นทุนต่อหน่วยของความซับซ้อน จำนวนหน่วยที่ระบุไว้ในโครงสร้างของผลิตภัณฑ์ pds001 - เปิด ) .
7 = ผู้ใช้กำหนดเขตข้อมูลในแฟ้มรายการ
95 = ขอบเงิน นั่นคือความแตกต่างระหว่างราคาต้นทุนและราคาที่ขายในงาน .
96 = ตัวตั้งตัวตีความแตกต่าง
97 = การกระจายต้นทุนการกระจายสินค้า ใช้เมื่อกล่องเช็ค 22 ' แยกต้นทุนในส่วนของการเลือก ( pcs001 / F ) สำหรับรายละเอียดดูเอกสารปรับแต่งการตั้งค่าพื้นฐานการคำนวณต้นทุนผลิตภัณฑ์ใน M3
กระบวนการสำคัญเอกสาร98 = ยก ( เปลี่ยนราคามาตรฐาน ) สำหรับการกระจายสินค้า ตัวผลักดันต้นทุนนี้มีการปรับปรุงเมื่อ ( dps290 - การกระจายต้นทุน การเลือก Calc ) คือวิ่งให้ส่วนประกอบย้ายค่าการตั้งค่าเลือกใน ( dps290 / E - การกระจายต้นทุน การเลือก Calc ) =

= 99 เปอร์เซ็นต์ order-initiated ไดรเวอร์ค่าใช้จ่าย :
41 = ต้นทุนต่อวัน ระยะเวลา .
42 = ค่าใช้จ่ายในการสั่งซื้อสินค้า ( ต้นทุนต่อการสั่งซื้อ ) .
43 = จำนวนของวัสดุที่เส้นในโครงสร้าง ( อัตราคูณด้วยจำนวนของบรรทัด )
44 = หมายเลขของบรรทัดการดำเนินงาน ( ไม่รวมรับเหมา ) ในโครงสร้างที่เป็นค่าใช้จ่ายในการดำเนินงาน ( อัตราคูณด้วยจำนวนของบรรทัด )
45 = จำนวนเส้นรับเหมางานในโครงสร้างที่เป็นค่าใช้จ่ายในการดำเนินงานรับเหมา( อัตราคูณด้วยจำนวนของบรรทัด )
46 = โครงสร้างความซับซ้อน - ดูต้นทุนไดรเวอร์
6 ข้างต้น
การแปล กรุณารอสักครู่..
 
ภาษาอื่น ๆ
การสนับสนุนเครื่องมือแปลภาษา: กรีก, กันนาดา, กาลิเชียน, คลิงออน, คอร์สิกา, คาซัค, คาตาลัน, คินยารวันดา, คีร์กิซ, คุชราต, จอร์เจีย, จีน, จีนดั้งเดิม, ชวา, ชิเชวา, ซามัว, ซีบัวโน, ซุนดา, ซูลู, ญี่ปุ่น, ดัตช์, ตรวจหาภาษา, ตุรกี, ทมิฬ, ทาจิก, ทาทาร์, นอร์เวย์, บอสเนีย, บัลแกเรีย, บาสก์, ปัญจาป, ฝรั่งเศส, พาชตู, ฟริเชียน, ฟินแลนด์, ฟิลิปปินส์, ภาษาอินโดนีเซี, มองโกเลีย, มัลทีส, มาซีโดเนีย, มาราฐี, มาลากาซี, มาลายาลัม, มาเลย์, ม้ง, ยิดดิช, ยูเครน, รัสเซีย, ละติน, ลักเซมเบิร์ก, ลัตเวีย, ลาว, ลิทัวเนีย, สวาฮิลี, สวีเดน, สิงหล, สินธี, สเปน, สโลวัก, สโลวีเนีย, อังกฤษ, อัมฮาริก, อาร์เซอร์ไบจัน, อาร์เมเนีย, อาหรับ, อิกโบ, อิตาลี, อุยกูร์, อุสเบกิสถาน, อูรดู, ฮังการี, ฮัวซา, ฮาวาย, ฮินดี, ฮีบรู, เกลิกสกอต, เกาหลี, เขมร, เคิร์ด, เช็ก, เซอร์เบียน, เซโซโท, เดนมาร์ก, เตลูกู, เติร์กเมน, เนปาล, เบงกอล, เบลารุส, เปอร์เซีย, เมารี, เมียนมา (พม่า), เยอรมัน, เวลส์, เวียดนาม, เอสเปอแรนโต, เอสโทเนีย, เฮติครีโอล, แอฟริกา, แอลเบเนีย, โคซา, โครเอเชีย, โชนา, โซมาลี, โปรตุเกส, โปแลนด์, โยรูบา, โรมาเนีย, โอเดีย (โอริยา), ไทย, ไอซ์แลนด์, ไอร์แลนด์, การแปลภาษา.