To stop the caisson at the desire d depth, eight 200-ton-capacity piles were driven around the perimeter of the caisson. Landing haunches on the sides of the caisson were designed to bear on the piles (Figure 3). Once the caisson landed, cement – stabilized fly ash was placed up to the level of the interior base slab. This greatly improved base stability and allowed the floor slab to be placed in a single pour.