Design capacity is what the engineers have designed a plant to operate at. Effective capacity is what the plant actually runs at. At most modern, large scale plants the effective capacity can often exceed the design capacity. Engineering types are conservative and want to make sure they operate to specs. As a result, designs often contain redundancies. As a result, simple de-bottlenecking can often "add" capacity.