As may be seen in this example, concrete
allowed to dry out immediately achieves only 40%
of the strength of the same concrete water cured
for the full period of 180 days. Even three days
water curing increases this figure to 60%, whilst
28 days water curing increases it to 95%. Keeping
concrete moist is therefore, a most effective way of
increasing its ultimate strength.