Regarding FUWA infill project which will be started in Mar’16, there is a task that we need to prepare. At the FUWA has equipped with Crane American Aero model G20B, the A-Frame of the crane will obstruct when the jack up rig approach to the platform. Therefore, we need to lowering this A-frame before rig arrival for infill project krub.