Production control engineering position at THAI YAMAHA MOTOR CO.,LTD My responsible is Control and Production planning is based master plan for support Manufacturing the best production. Limitations capacity each shop and Solve a problem when Problems in production. Responsible is manage part of M-part each shop kind of work each Shop production and consign to part line Assembly. (Main line) So I am in change of Shop WPP and Shop Aluminum planting
WPP is 1. Shop welding is joining the frame of car.
2. Shop EDP is coating with zinc.
3. Shop plaiting is coating with chromium and protector muffler.
4. Shop muffler is composed of sub muffler.
Shop Aluminum planting is blow with handle seat and cover crank case.