Implementation of Trial Permanent Subsurface Drainage Scheme
Once the appropriate permanent subsurface drainage scheme is selected, a trial section can be performed. Close monitoring of the water level can be made through checking by the standpipes within that pavement block. The effectiveness of the method can be evaluated before final implementation.