After completion of welding from both sides remove all the temporary jigs and fixtures and flush grind the tacks. (Do the weld fill up wherever required) and the portion checked by D.P.test.
After completion of welding from both sides remove all the temporary jigs and fixtures and flush grind the tacks. (Do the weld fill up wherever required) and the portion checked by D.P.test.