Do you mean the specification of the metal clip is confirmed, the material should be prepared right away, and we still need to find the better way of assembly? Right?
I think it must be some error on it because of in PP shows nothing strange.
But only in consign, kindly help to recheck and re confirm krab. Normally the data between PP and consign should be same, right?