How large should the cache for the collected waste be, before it will be
processed (e.g. 1-5 days)?
9) What share is the organic part in the inbound material ? (e.g. 35-70% with
domestic waste, 60-85% with organic waste)
10) Is it concerning a new installation or is it an adaption of a current
installation/system?