Team STEC. I want to provide an update about what we will be able to finish by Friday.
1. Data Center
a. We will propose a data center layout and overall design of the power system, air conditioning and rack layout.
b. We will not be able to finalize quotes with subcontractors for the following items based on the time available.
i. Generator
ii. Power Distribution Units
iii. Air Conditioning
iv. Access Control and Monitoring system
v. Fire protection system
2. Server
a. We will provide three possible solutions for the server Thanawat originally requested with pricing.
b. We are waiting for AOI to confirm TOPS system requirements to determine which server design will be best for STEC.
3. Network
a. We will propose a network layout that matches the overall request from Thanawat with pricing however this will not include fiber re-cabling.
b. We will not be able to propose the logical layout of the VLANs and IP Networks as Thanawat did not provide these requirements to us during the visit today. Our solution will be flexible however the exact professional services estimate will be based on assumptions, not the actual requirements from Thanawat since these were not provided.
4. Desktop
a. We will propose a desktop solution with pricing based on the original request from Thanawat.
Thank you.
Adam