Electricity and Power Distribution System:
Electricity Supply:
(a) The Employer, at the electricity consumption level specified by the Employer, will supply electricity free of charge to the Contractor, at GIS substation as specified in the Article 2.3.3(e) [Waste Line 2 GIS Station], to perform only for the Operation and Maintenance Services using the Employer's Facility; provided that the Contractor shall use its best effort to control and maintain its power usage requirements inconsistent to such level specified by the Employer.
(b) The Employer shall provide electricity pursuant to the electricity consumption plan submitted by the Contractor to the Employer in the Long term Operation and Maintenance Work Plan and Yearly Operation and Maintenance Work Plan.
(c) The Contractor shall complete the following works before the Commencement Date:
(i) the Contractor shall, at its sole cost, procure Kilowatt Hour meters and accessories in connection to the Contractor's Facility and using for connection to the workshop and store area provided by the Employer in the Employer's Facility and install them at the locations shall be specified by the Employer in the Project Requirement Notices.
(ii) the Employer shall use it best effort to provide the 22kV power distribution system or other system close to the Contractor's Facility in the location as possibly, at its own discretion; provided that the Contractor shall, at its sole cost, procure and install the power distribution line from the Employer's nearest transmission line system to the Contractor's Facility including procure and install any electrical
Electricity and Power Distribution System:
Electricity Supply:
(a) The Employer, at the electricity consumption level specified by the Employer, will supply electricity free of charge to the Contractor, at GIS substation as specified in the Article 2.3.3(e) [Waste Line 2 GIS Station], to perform only for the Operation and Maintenance Services using the Employer's Facility; provided that the Contractor shall use its best effort to control and maintain its power usage requirements inconsistent to such level specified by the Employer.
(b) The Employer shall provide electricity pursuant to the electricity consumption plan submitted by the Contractor to the Employer in the Long term Operation and Maintenance Work Plan and Yearly Operation and Maintenance Work Plan.
(c) The Contractor shall complete the following works before the Commencement Date:
(i) the Contractor shall, at its sole cost, procure Kilowatt Hour meters and accessories in connection to the Contractor's Facility and using for connection to the workshop and store area provided by the Employer in the Employer's Facility and install them at the locations shall be specified by the Employer in the Project Requirement Notices.
(ii) the Employer shall use it best effort to provide the 22kV power distribution system or other system close to the Contractor's Facility in the location as possibly, at its own discretion; provided that the Contractor shall, at its sole cost, procure and install the power distribution line from the Employer's nearest transmission line system to the Contractor's Facility including procure and install any electrical