All subcontractors and material suppliers for this project must be approved by
Nooter/Eriksen prior to use.
4.0 All welding and NDE to be in accordance with Nooter/Eriksen specifications,
Customer specifications, and applicable Code requirements. All WPS/PQR
documentation must be submitted to N/E 4 weeks prior to fabrication.
5.0 N/E inspection checklists, 150200QD001, are included in PO documentation –
Supplied Later
6.0 Non-ASME/ASTM materials require approval by Nooter-Eriksen prior to use.
N/E has approval to use the following material and as noted in the N/E
calculations and drawings:
A) SS400 (with chemical properties to meet ASTM A36).
B) SM440A
C) SM490YA
7.0 In case of conflicts between drawings, specifications and standards, the more
stringent shall govern unless specifically approved in writing. If the supplier
cannot determine which is the most stringent, then they shall contact
Nooter/Eriksen Project Engineer for resolution.
8.0 Paint (Colors will be supplied later)
a. Sandblast all exterior surfaces to SSPC-SP6
b. Shop applied Carboline Carbozinc 11 primer – 3 mil dft. (75 microns) dry
film thickness
c. Shop Applied 1 Coat Non-Aluminum Silicone Finish Coat – 2-4 mil dft. (50-
100 microns) dry film thickness
d. Do not paint within 100mm of field weld areas
e. Coat all field weld areas with Carboline Carbo Weld 11.
f. Stainless steel components shall not be coated
g. Shipping braces, temporary steels and shipping fixtures shall be painted