AREA 1: the present waste is a watery sludge. It must be transported
to an acceptable discharge point. Truck operating costs and dumping
fees are major Items in the costs of brine reclamation.
If the sludge could be de-watered to form a cake, If could be handled
As a solid waste.
If is recommended that development of a method for complete be-watering
be carried out at the present site by present personnel.