III.1. Case Study
The proposed hybrid power system for the city of
Brest is tested using a practical load demand profile with
real weather data: The latitude and longitude for location
(48,45° N latitude, –4,42° E longitude). The project
estimated lifetime is about 25 years while the annual
interest rate is fixed to 6%.