The greatest learning experience from this project was that many times, an intended design does not always work as planned. More specifically, the largest problems that occurred in the construction and design of the pill dispenser was with the delivery system of the pills. It was very difficult, even with the use of motor and propellers to align the pills, to properly place the pills in the pill slider without another pill falling into place. The result is that occasionally either the pill slider would “jam” or the pill slider would deliver two pills. Another experience worth mentioning is that group communication is one of the most important things about working on a project. It was very easy for our group to relate to one another what was required of each individual to complete the project. Without proper communication between group members we believe that it would be difficult if not impossible to design and produce a successful project