In some cases it is not possible for the primary regulation to keep the power system within the limits defined above after a disturbance. One reason can be insufficient available power after the loss of a large turbine. The only means of preventing a collapse of the power system in such cases is to shed sufficient load quickly enough that the generation can continue to supply the priority loads. Plant-wide fast load shedding is one of the typical functions implemented in a PMS.