From the architect. Since the site was already very tight, the form was simply the shape of the site, stretched to maximum, build-able envelope according to regulation setback. This turn out to be an unexpected opportunity to exploit unique form and space that would be difficult to justify under normal circumstance. The full envelope form was then carved at the front to create a triple height, open-air, arrival hall.