Before collecting data or calibrating the drops, adjust the flow rate of the two
valves of the reagent reservoir. Temporarily, place another beaker below the
spout of the reagent reservoir. First, completely open the bottom 2-way valve;
then slowly open the top valve until a very slow drop rate is achieved—a rate
of one drop every two seconds, or slower. Close the bottom valve.