Grid congestion can pose significant curtailment problems if transmission infrastructure does not develop quickly enough to support renewable energy development. This has been the case for some RTOs, such as the Midcontinent Independent System Operator, where wind generation proliferated and outpaced the development of necessary transmission capacit